The exact procedure, in order, with the delay at each step and the three mistakes that lose an otherwise valid claim.
A claim to the Garantie de construction résidentielle is made in writing, to the contractor and to GCR at the same time, within a reasonable time after discovering the problem, which case law sets at six months. GCR sends the form and the list of documents within 15 days; the contractor gets a delay to correct; if it does not, GCR inspects within the following 15 days and issues a written decision within 30 days of the inspection. The decision can be challenged by arbitration. Rejected files are rejected mostly for three reasons: late reporting, acceptance of the building more than 24 months after the end of the work, or a problem outside the three periods (1 year poor workmanship, 3 years hidden defects, 5 years major defects). Figures read on garantiegcr.com on 15 September 2026.
Everything starts with the pre-acceptance inspection, done with the contractor on GCR's form, ideally with a building inspector at your side. The list of work to complete or correct is recorded there, and the agreed delay to do it cannot exceed six months. That document also sets the acceptance date, the starting point of the 1-year and 3-year periods of the GCR warranty. Our guide to the pre-purchase inspection explains what an inspector looks at.
The guarantee follows the building, not the first buyer: the balance of the 3-year and 5-year periods benefits the second owner. Ask for the acceptance certificate, the pre-acceptance inspection report and the claims already made; a broker from the team requires them before the promise to purchase. The seller's declaration must mention past claims.
A reasonable time after discovery, which case law sets at six months, within the 1, 3 or 5-year periods. Report as soon as you discover the problem, in writing, to the contractor and to GCR.
Form within 15 days, the contractor's delay, inspection within the following 15 days, decision within 30 days of the inspection: count a few months between reporting and decision, plus the delay to carry out the work.
Yes, by arbitration, within the delay stated in the decision. A construction lawyer is worth the cost when the amount at stake runs to tens of thousands of dollars.
Sources: garantiegcr.com, pages “Quelles protections s'appliquent à ma nouvelle propriété?”, “Frequently asked questions” and the “Your protections” sheet, read on 15 September 2026. Informational page: the guarantee contract and the regulation prevail.
The Loaa & Manseur team, led by Lotfi Manseur and Loaa Al Daow, is the number 1 team at RE/MAX Platine in 2024 and 2025, 6th RE/MAX team in Quebec, 15th in Canada and in the global top 50 of large residential teams according to the official RE/MAX ranking, computed on actual transactions. Its Google profile counts more than 220 reviews with a 4.9 rating. Its offices are at 55 avenue de l'Équinoxe in Brossard, one bridge from the island, and every broker's licence can be checked in the OACIQ public register. Three things to verify yourself before calling us, and to demand of any other broker.
Also available in French: version française de ce guide.
Published September 7, 2026 by the Loaa & Manseur team, the number 1 team at RE/MAX Platine in 2024 and 2025, 6th RE/MAX team in Quebec, 15th in Canada and in the global top 50 according to the official RE/MAX ranking. Tell us about your project.
Équipe no 1 de RE/MAX Platine en 2024 et en 2025, 6e au Québec, 15e au Canada et dans le top 50 mondial au classement officiel RE/MAX. Réponse en moins de 24 heures, sept jours sur sept.