The official permit fee in Terrebonne, the delay and when it really starts, the work that needs none, the documents that block, and what unpermitted work costs on resale.
The building permit in Terrebonne in 2026: Form P-02 refers to the “fees payable under the tariff by-law in force” (by-law 2527, 2026 tariff), whose planning-fee schedule is not attached to the version published online: the amount is confirmed with the Direction de l'urbanisme durable. Delay: the City does not post an issuance delay. Every new main residential building goes through form P-02 (updated 13 July 2026); an extension goes through P-05 and an alteration without extension through P-19. The official delay only starts with a complete file (site plan by a land surveyor, plans, estimate), and a project that needs a minor variance or a PIIA waits for the council sitting. Figures read on 16 September 2026 on the City's official website.
Form P-02 refers to the “fees payable under the tariff by-law in force” (by-law 2527, 2026 tariff), whose planning-fee schedule is not attached to the version published online: the amount is confirmed with the Direction de l'urbanisme durable. Fees are added for garbage and recycling bins and for the connection to municipal services.
The permit fee is never the real cost of the project: it comes on top of the surveyor's site plan, the architectural plans, the connection permit where it is separate, and the welcome tax that follows the purchase. Our page buying a new build (in French) puts the other items end to end.
The City does not post an issuance delay. Depending on the sector, the project is subject to the PIIA by-law (form U-01 for 1 to 2 dwellings, U-02 for 3 dwellings and more) and then requires executive committee approval before the permit.
Every new main residential building goes through form P-02 (updated 13 July 2026); an extension goes through P-05 and an alteration without extension through P-19. For small jobs (shed, fence, deck), our guide which small works need a permit (in French) gives the general rules, and the borough or planning department decides for your address.
The City asks for: a site plan prepared by a land surveyor, the cost of construction and landscaping work, the owner's power of attorney if needed and, when it applies, a stormwater management plan signed by an engineer under schedule 04 of by-law 2607. In a flood zone, the site plan must show the high-water mark, the shoreline, the slope, elevations and the 0-20-year and 20-100-year zones, with an engineer's report and flood-proofing plans; in a landslide-prone zone, a surveyor's plan locates the exposed area. The document that blocks most often is the site plan: it comes from a land surveyor, not from the builder, and it must be ordered early. Our guide to boundary marking and the surveyor explains it.
An extension, a garage or a basement apartment built without a permit does not disappear at the sale: the new certificate of location shows it, the seller's declaration requires you to declare it, and an informed buyer negotiates the price or demands regularization. The municipality can fine you and, in serious cases, order demolition. Before selling a converted property, have the permits checked by a broker from the team: that file is settled before the first showing, not at the notary's.
Form P-02 refers to the “fees payable under the tariff by-law in force” (by-law 2527, 2026 tariff), whose planning-fee schedule is not attached to the version published online: the amount is confirmed with the Direction de l'urbanisme durable. Figures read on 16 September 2026: terrebonne.ca.
The City does not post an issuance delay. The delay only runs from a complete file, and a minor variance, a PIIA or a specific project adds the council step.
A fine, a stop-work order and, in serious cases, an obligation to restore. On resale, unpermitted work shows on the certificate of location and in the seller's declaration: it is then paid for in negotiation or in regularization.
Sources: terrebonne.ca, form P-02 “Construction d'un bâtiment principal – Résidentiel” (updated 2026-07-13) and by-law 2527 (2026 tariff), read on 16 September 2026. Municipal fees are indexed every year; this page is redone when the City publishes its new grid. It is informational: the City decides for your project.
The Loaa & Manseur team, led by Lotfi Manseur and Loaa Al Daow, is the number 1 team at RE/MAX Platine in 2024 and 2025, 6th RE/MAX team in Quebec, 15th in Canada and in the global top 50 of large residential teams according to the official RE/MAX ranking, computed on actual transactions. Its Google profile counts more than 220 reviews with a 4.9 rating. Its offices are at 55 avenue de l'Équinoxe in Brossard, one bridge from the island, and every broker's licence can be checked in the OACIQ public register. Three things to verify yourself before calling us, and to demand of any other broker.
Also available in French: version française de ce guide.