Building permit in Mirabel in 2026: what it costs, the real delay, exempt work and the documents to prepare

Building · Permit · Mirabel · 2026

The official permit fee in Mirabel, the delay and when it really starts, the work that needs none, the documents that block, and what unpermitted work costs on resale.

The building permit in Mirabel in 2026: Permits and certificates by-law U-2303 (section 5. Example: $450 for $450,000 of work. Delay: the by-law sets no issuance delay; the $1,000 guarantee is refunded only after open spaces and parking are landscaped in compliance, so at the end of the project. Every main building, its reconstruction, extension and renovation require a building permit; a detached garage pays $1 per square metre, minimum $100, and any other accessory building $1 per square metre, minimum $50. The official delay only starts with a complete file (site plan by a land surveyor, plans, estimate), and a project that needs a minor variance or a PIIA waits for the council sitting. Figures read on 16 September 2026 on the City's official website.

What the building permit costs in Mirabel in 2026

Permits and certificates by-law U-2303 (section 5.1.1, amended by by-law U-2617 of 14 February 2024): building a main residential building costs $450 for the first dwelling, $250 per dwelling for dwellings 2 to 12 and $100 per dwelling beyond, plus a $1,000 financial guarantee refunded on request once open spaces and parking are landscaped in compliance with zoning. An additional dwelling costs $250, an extension $100 plus $1 per square metre added, a renovation $100. On a new house whose work is estimated at $450,000, the permit comes to $450.

The permit fee is never the real cost of the project: it comes on top of the surveyor's site plan, the architectural plans, the connection permit where it is separate, and the welcome tax that follows the purchase. Our page buying a new build (in French) puts the other items end to end.

The delay, and when it starts

The by-law sets no issuance delay; the $1,000 guarantee is refunded only after open spaces and parking are landscaped in compliance, so at the end of the project.

When you need a permit in Mirabel, and when you do not

Every main building, its reconstruction, extension and renovation require a building permit; a detached garage pays $1 per square metre, minimum $100, and any other accessory building $1 per square metre, minimum $50. For small jobs (shed, fence, deck), our guide which small works need a permit (in French) gives the general rules, and the borough or planning department decides for your address.

The documents to prepare

The City asks for: the City asks for the site plan, the construction plans and the estimate; the exact list follows by-law U-2303 according to the type of project. The document that blocks most often is the site plan: it comes from a land surveyor, not from the builder, and it must be ordered early. Our guide to boundary marking and the surveyor explains it.

The five steps, in order

  1. Check the zoning before buying the lot or drawing. Permitted use, setbacks, height, lot coverage, PIIA: the zoning grid is read before the plans, not after. Our guide buying land in Quebec (in French) lists what to check.
  2. Have the site plan prepared by a land surveyor and, if the lot is created for the project, get the subdivision permit first.
  3. File a complete application. The official delay only starts then: an incomplete file is the first cause of delay everywhere in Quebec.
  4. Pay and display the permit, then respect the start and completion deadlines, or the permit is renewed at your expense.
  5. Request the inspections at the planned stages (foundations, structure, end of work) and keep the permit, the approved plans and the invoices: on resale, the buyer and the notary will ask for them.

Work without a permit: what it costs on resale

An extension, a garage or a basement apartment built without a permit does not disappear at the sale: the new certificate of location shows it, the seller's declaration requires you to declare it, and an informed buyer negotiates the price or demands regularization. The municipality can fine you and, in serious cases, order demolition. Before selling a converted property, have the permits checked by a broker from the team: that file is settled before the first showing, not at the notary's.

Frequently asked questions

How much does a building permit cost in Mirabel?

Permits and certificates by-law U-2303 (section 5. Example: $450 of permit fees for $450,000 of work. Figures read on 16 September 2026: mirabel.ca.

How long does a building permit take in Mirabel?

The by-law sets no issuance delay; the $1,000 guarantee is refunded only after open spaces and parking are landscaped in compliance, so at the end of the project. The delay only runs from a complete file, and a minor variance, a PIIA or a specific project adds the council step.

What happens if I build without a permit in Mirabel?

A fine, a stop-work order and, in serious cases, an obligation to restore. On resale, unpermitted work shows on the certificate of location and in the seller's declaration: it is then paid for in negotiation or in regularization.

Sources: mirabel.ca, permits and certificates by-law U-2303, section 5.1.1 (fees), read on 16 September 2026. Municipal fees are indexed every year; this page is redone when the City publishes its new grid. It is informational: the City decides for your project.

Our proof, not our promises

The Loaa & Manseur team, led by Lotfi Manseur and Loaa Al Daow, is the number 1 team at RE/MAX Platine in 2024 and 2025, 6th RE/MAX team in Quebec, 15th in Canada and in the global top 50 of large residential teams according to the official RE/MAX ranking, computed on actual transactions. Its Google profile counts more than 220 reviews with a 4.9 rating. Its offices are at 55 avenue de l'Équinoxe in Brossard, one bridge from the island, and every broker's licence can be checked in the OACIQ public register. Three things to verify yourself before calling us, and to demand of any other broker.

Also available in French: version française de ce guide.

Published September 7, 2026 by the Loaa & Manseur team, the number 1 team at RE/MAX Platine in 2024 and 2025, 6th RE/MAX team in Quebec, 15th in Canada and in the global top 50 according to the official RE/MAX ranking. Tell us about your project.

★★★★★4,9 sur 5, d'après 221 avis Google Évaluation gratuite 438 807 3653
Équipe no 1
RE/MAX Platine, 2024 et 2025
4,9 sur 5
221 avis Google, fiche publique
Top 50
des équipes RE/MAX au monde, 6e au Québec

Votre projet mérite la meilleure équipe.

Équipe no 1 de RE/MAX Platine en 2024 et en 2025, 6e au Québec, 15e au Canada et dans le top 50 mondial au classement officiel RE/MAX. Réponse en moins de 24 heures, sept jours sur sept.

Obtenir mon évaluation gratuite
55, avenue de l'Équinoxe, Brossard
438 807 3653
Évaluation gratuite Appeler